Case Study 2
Combined Heating and Cooling in a Paint shop
Customer-A leading two-wheeler automobile manufacturer
Application– Surface Cleaning in Paint Shop
Hot water requirement– 4pre-treatment tanks, each tank to be maintained at 60-70 Deg C
Source of heat replaced – Liquified Petroleum Gas (LPG)
Boiler consuming around 650 kg of LPG per day
Combined Heating and Cooling
Condenser side – replaced the fired boiler Evaporator side- replaced the chiller which was used for electrode position process.