Case Study 5
Case Study Drying Application for a Large Cardamom Producer
- Customer – Agricultural industry
- Application – Cardamom Drying
- Hot Water Requirement – To reduce the fuel and Electricity consumption of the existing System. Temperature Requirement is 75 °C
- Source of Heat replaced – Diesel Generators and Electricity