Case Study 5

Case Study Drying Application for a Large Cardamom Producer

  • Customer – Agricultural industry
  • Application – Cardamom Drying
  • Hot Water Requirement – To reduce the fuel and Electricity consumption of the existing System. Temperature Requirement is 75 °C
  • Source of Heat replaced – Diesel Generators and Electricity

Send Your Enquiry